01
Survey
We visit, measure the roof, log your loads and check shading. You get the measurements in writing.
Day 0–3
02
Design
Sizing, a wiring diagram and a written quote with every assumption listed. No surprises.
Day 3–5
03
Install
Certified technicians, one to three days on site. Everything tested and commissioned before we leave.
Day 7–14
04
Monitor
A phone report each month, an annual check visit and panel cleaning. We are one call away.
Ongoing
Survey day
What we measure, and why.
Roof area, pitch and orientation; shade from trees and buildings; the state of your wiring and distribution board; and the appliances you cannot afford to lose. Those decide the size and the safe design — not a sales target.
- Roof and structure check
- Shade and orientation log
- Load list with real wattages
- Distribution board and earthing inspection

Installation
Done properly, then tested.
Mounting hardware is fixed to the structure, not just the roofing sheet. Cabling is protected and labelled, and the system is tested under load before handover. You get a wiring diagram, warranty papers and a walk-through.
- Certified installers, PPE and fall protection
- Weather-sealed penetrations
- Protection devices and earthing to local regulations
- Commissioning test under load

Financing
Pay the way that suits your cash flow.
Sample terms — replace them with yours.
| Option | Deposit | Term | Notes |
|---|---|---|---|
| Cash | 50% deposit, balance on commissioning | — | Households and businesses with savings. |
| Pay-as-you-go | 20% deposit | 12–36 months | Fixed instalments by mobile money (M-Pesa, Tigo Pesa, Airtel Money). Ownership transfers on the final payment. |
| Lease | 10–20% deposit | 24–60 months | Registered businesses. Maintenance included. Payments may be tax-deductible — check with your accountant. |
Mobile money (M-Pesa, Tigo Pesa, Airtel Money) is offered as a payment method. Instalments are fixed at signing and ownership transfers on the final payment.